How to Print & Assemble The FALCON HEAVY-S1 Lift-off Stand

How to print the FALCON HEAVY-S1 Lift-off Stand

If you want to save this How-To instruction as a pdf file (and print it out later if needed), simply copy the URL of this page and paste it to https://www.printfriendly.com/ . Printfriendly will generate a printer-friendly pdf of the page with all the texts and images for you.

Please consider joining Morethan3D community on our Discord channel to discuss 3D printing hints & tips, ask questions, and get help if you come across any printing issues.

The STL package of this model includes an “All-In-One” Print Profile created for Bambu Lab X1 and P1 Series 3D printers. If you intend to use any of those printers to print the model, follow this instruction to print all parts: How to use Bambu Studio’s All-In-One Print Profile

If you don’t have access to any Bambu Lab X1 and P1 Series 3D printers. All of the STL files are really straight forward to print. All you need to do is load them into your slicer software (e.g. Cura), select your desirable settings (e.g. layer height, infill percentage, etc.) and slice the parts.

Please note: I already saved the STL for each part in the orientation I printed them on my FDM printer. Hence, when you load the STL in your slicer software, you don’t need to orientate them again, unless you want to try to print them in a different orientation.

Below are some tips

  • All parts of this model can be printed without support.

How to assemble this model?

So now you’ve got all your parts printed? Great! Let’s assemble the model. I’ll take you through the assembly process step by step but before that, you need to purchase some items:

  • Brass Solid Round Rod 2mm Diameter 100mm Length (LINK) | Qty: 12-off
  • LED Light (LINK) | Qty: 3-off (The model was designed specifically to fit this LED Light. You can use any other LED light as long as it fits
  • Super glue (LINK) | Qty: 1 bottle

STEP 1: Assemble the Static Test Flame

Parts required (refer to the photos below)

  • 1x Lift-off Stand (a)
  • 24x Stand rods (2mm Dia x 50mm L)  (b)

Assembly process

  1. STEP 1a: Cut 24x 2mm dia rods to the correct length (50mm) and install them into the Lift-off Stand
  2. STEP 1b: Place the FALCON HEAVY model on the Stand (ensure all the rods are inserted through the engine bells so that the FALCON HEAVY model is seated properly)

Your Cart

No products in the basket.