How to Print & Assemble The ARTEMIS II-S1

How to print the ARTEMIS II-S1

If you want to save this How-To instruction as a pdf file (and print it out later if needed), simply copy the URL of this page and paste it to https://www.printfriendly.com/ . Printfriendly will generate a printer-friendly pdf of the page with all the texts and images for you.

Please consider joining Morethan3D community on our Discord channel to discuss 3D printing hints & tips, ask questions, and get help if you come across any printing issues.

The STL package of this model includes an “All-In-One” Print Profile created for Bambu Lab H2 Series 3D printers. If you don’t have a H2 Series but any other printers from Bambu Lab, simply load the profile in Bambu Studio and change the printer setting to your printer. If you are new to 3D printing and never use a “All-In-One” Print Profile before, follow this instruction: How to use Bambu Studio’s All-In-One Print Profile

If you don’t have access to any Bambu Lab 3D printers. We recommend you to download Bambu Studio and load our Profile up so you can replicate the print settings that we use for each part of the model in your own slicer. Most parts of the model can be printed with a standard 0.4mm Nozzle. However, to achieve the optimum result for parts with small details, we strongly recommend using a 0.2mm Nozzle

Please note: The STL for each part was saved in the recommended orientation to print on FDM printers. Hence, when you load the STL in your slicer software, you don’t need to orientate them again, unless you want to try to print them in a different orientation.

Below are some tips

  • There are two “All-In-One” Bambu Studio Profiles created for this model:
    – ARTEMIS II_S1 [MORETHAN3D – H2D Profile] – 0.2 Nozzle
    This profile contains all parts that are recommended to print with a 0.2mm Nozzle

    – ARTEMIS II_S1 [MORETHAN3D – H2D Profile] – 0.4 Nozzle
    This profile contains all parts that are recommended to print with a 0.4mm Nozzle

    It is strongly recommended that you use the correct Nozzle size to print the parts to achieve the optimum result. You can print all parts with a 0.4mm Nozzle if you don’t have a 0.2mm one, but some parts won’t look as good as they should

  • All magnet holes can be printed without support regardless of their positions/orientations on the model. Please don’t generate support for these holes (unless you really need to). Otherwise, you may struggle to remove support inside the holes due to restricted access.

  • All internal grid pattern can be printed without support.

  • This model is designed in such a way to allow you to assemble and disassemble the model into piece part level, because almost every part is held together by magnets. However, if you prefer to glue everything, or some parts, together, that’s also fine – but please be aware that if you do, it may be difficult to update the model later on.

  • There are three STL’s in folder ‘STEP 01’ called ‘ARTEMIS II – S1_Assembly’, ‘Complete Second Stage Assembly’ and ‘Engine Section Assembly’.
    If you load these files (separately), you’ll see the fully assembled ARTEMIS II model, and the internal plumbing of the rocket. This will help you understand where each and every part is fitted on the model.

  • This model contains a number of parts that require multi-colour printing.
    To print these multi-colour parts, all you need to do is load both files of the same part (e.g. Black, and White) into your slicer software, assign the correct colour to the part, and print.
    Please note: Multi-colour parts are saved from the same coordinate in relation to each other. Hence, when you load them into your slicer software, they should merge together correctly. You don’t need to align them manually

  • At STEP 12, we recommend you use metal Dowel Pins (3mm dia x 20mm L) for this model. However, if you don’t want to purchase metal dowel pins, you can also print them – please find the STL for this dowel pin in STEP 99 – OPTIONAL PARTS folder

  • This model is designed at 1:96 scale, hence, it is recommend that you print at this scale to achieve the highest quality. However, if you decide to print the model at a smaller scale, please be aware that the magnets we selected for this model will no longer fit  and you will have to find smaller magnets to fit, or glue the parts together.

How to assemble this model?

So now you’ve got all your parts printed? Great! Let’s assemble the model. I’ll take you through the assembly process step by step but before that, you need to purchase some items:

  • 5mm dia x 3mm thick N42 Neodymium magnets (LINK) | Qty: 74-off
  • 3mm dia x 2mm thick N42 Neodymium (LINK) | Qty: 124-off
  • 3mm dia x 20mm L Dowel Pin (LINK) | Qty: 4-off
  • Super glue (LINK) | Qty: 1 bottle

STEP 1: ‘Dry’ assemble the model

At this step, all I want you to do is try to stack all the parts together to get a good understanding of where they are located. Because there are a lot of magnets you need to fit during the assembly process, doing this first step will give you an idea of how to fit the magnets in each part correctly. Please use the files in STEP 01 folder, and the photos below if required.

STEP 2: Assemble the Orion Spacecraft

Parts required (refer to the photos below)

  • 1x Launch Abort System (a)
  • 1x Orion Crew Module (b)
  • 1x Orion Crew Module Heat Shield (c)
  • 1x Orion Service Module (Top) (d)
  • 1x Orion Service Module (Bottom) (e)
  • 6x Orion Service Module Thrusters (f)
  • 4x Solar Panel (Folded) (g)
  • 1x Spacecraft Adapter (h)
  • 3x Service Module Panels (i)
  • 2x Locating Pin (j)
  • 46x Magnets (3mm dia x 2mm thick) (highlighted in RED)
  • 2x Magnets (5mm dia x 3mm thick) (highlighted in RED)

Assembly process

  1. STEP 2a: Glue 1x magnet (5mm dia x 3mm thick) into the hole at the bottom of the Launch Abort System
  2. STEP 2b: Glue 1x magnet (5mm dia x 3mm thick) into the hole at the top of the Orion Crew Module. Glue 4x magnets (3mm dia x 2mm thick) into their locations at the bottom of the Orion Crew Module Heat Shield. Finally, using 2x locating pins for alignment, glue the Orion Crew Module and its Heat Shield together.
  3. STEP 2c: Glue 10x magnets (3mm dia x 2mm thick) into their locations on the top (x4) and bottom (x6) faces of the Orion Service Module (Top)
  4. STEP 2d: Glue 4x magnets (3mm dia x 2mm thick) into their locations at the side of the Orion Service Module (Bottom)
  5. STEP 2e: Using 2x locating pins for alignment, glue the Orion Service Module (Top) and (Bottom) together
  6. STEP 2f: Glue 6x Orion Service Module Thrusters to the rectangular holes on the Orion Service Module
  7. STEP 2g: Glue 1x magnet (3mm dia x 2mm thick) into the hole at the bottom of back of each Solar Panel (Folded)
  8. STEP 2h: Install 4x Solar Panel (Folded) to the Orion Service Module
  9. STEP 2i: Glue 12x magnets (3mm dia x 2mm thick) into their locations at the side (x6) and bottom (x6) faces of the Spacecraft Adapter
  10. STEP 2j: Glue 4x magnets (3mm dia x 2mm thick) into their locations at the back of each Service Module Panel
  11. STEP 2k: Install all the components above together to form a complete Orion Spacecraft assembly

STEP 3: Assemble the Interim Cryogenic Propulsion Stage (ICPS)

Parts required (refer to the photos below)

  • 1x ICPS_01 (a)
  • 1x ICPS_02 (b)
  • 1x ICPS_03 (c)
  • 1x ICPS_04 (d)
  • 1x ICPS Engine (e)
  • 2x Locating Pin (f)
  • 14x Magnets (3mm dia x 2mm thick) (highlighted in RED)

Assembly process

  1. STEP 3a: Glue 6x magnet (3mm dia x 2mm thick) into their locations on the top face of the ICPS_01. Ensure the top of the magnets sit flush with the white top face
  2. STEP 3b: Glue the ICPS_01 and ICPS_02 together
  3. STEP 3c: Glue 8x magnet (3mm dia x 2mm thick) into their locations at the bottom face of the ICPS_01/02 above
  4. STEP 3d: Glue the ICPS_03 and ICPS_04 together (use 2x locating pins for alignment). Then, glue the ICPS Engine to the ICPS_04
  5. STEP 3e: Glue the two sub-assemblies above together (use the pipe from ICPS_03 for alignment)

STEP 4: Assemble the complete Second Stage

Parts required (refer to the photos below)

  • 1x Orion Stage Adapter (a)
  • 1x Orion Spacecraft from STEP 2 (b)
  • 1x ICPS assembly from STEP 3 (c)
  • 18x Magnets (3mm dia x 2mm thick) (highlighted in RED)

Assembly process

  1. STEP 4a: Glue 6x magnets (3mm dia x 2mm thick) into their locations on the top face of the ‘brackets’ located in the Orion Stage Adapter
  2. STEP 4b: Glue 12x magnets (3mm dia x 2mm thick) in stacks of 2 each into their locations at the bottom face of the Orion Stage Adapter
  3. STEP 4c: Install the Orion Spacecraft, Orion Stage Adapter, and ICPS assembly together – use the alignment features as shown in the pictures below to ensure correct orientation between each of them.

STEP 5: Assemble the Launch Vehicle Stage Adapter

Parts required (refer to the photos below)

  • 1x Launch Vehicle Stage Adapter (a)
  • 6x Launch Vehicle Stage Adapter Black Dot (Large) (b)
  • 4x Launch Vehicle Stage Adapter Black Dot (Small) (c)
  • 8x Magnets (3mm dia x 2mm thick) (highlighted in RED)
  • 4x Magnets (5mm dia x 3mm thick) (highlighted in RED)

Assembly process

  1. STEP 5a: Glue 6x Large black dots and 4x Small black dots into their locations on the side of the Launch Vehicle Stage Adapter
  2. STEP 5b: Glue 8x magnets (3mm dia x 2mm thick) into their locations on the top face of the Launch Vehicle Stage Adapter
  3. STEP 5c: Glue 4x magnets (5mm dia x 3mm thick) into their locations at the bottom face of the Launch Vehicle Stage Adapter – use the pictures below to ensure correct positions of the magnets

STEP 6: Assemble the Forward Skirt

Parts required (refer to the photos below)

  • 1x Forward Skirt (a)
  • 4x Matrix markings (b)
  • 2x Access Panels (c)
  • 2x Cameras (d)
  • 2x Locating Pin (e)
  • 8x Magnets (5mm dia x 3mm thick) (highlighted in RED)

Assembly process

  1. STEP 6a: Glue 4x Matrix markings to the side of the Forward Skirt
  2. STEP 6b: Glue 2x Access Panels to the side of the Forward Skirt
  3. STEP 6c: Glue 2x Cameras to the side of the Forward Skirt
  4. STEP 6d: Glue 8x magnets (5mm dia x 3mm thick) into their locations at the top (x4) and bottom (x4) faces of the Forward Skirt – use the pictures below to ensure correct positions of the magnets
  5. STEP 6e: Insert 2x Locating Pins into the holes on the top face of the Forward Skirt

STEP 7: Assemble the Liquid Oxygen Tank

Parts required (refer to the photos below)

  • 1x Liquid Oxygen Tank (a)
  • 3x Liquid Oxygen Tank Dot (Large) (b)
  • 14x Liquid Oxygen Tank Dot (Small) (c)
  • 1x Liquid Oxygen Tank Top Dome (d)
  • 1x Liquid Oxygen Tank Bottom Dome (e)
  • 2x Locating Pin (f)
  • 2x Magnets (3mm dia x 2mm thick) (highlighted in RED)
  • 8x Magnets (5mm dia x 3mm thick) (highlighted in RED)

Assembly process

  1. STEP 7a: Glue 3x Large dots and 14x Small dots into their locations on the side of the Liquid Oxygen Tank
  2. STEP 7b: Glue 8x magnets (5mm dia x 3mm thick) into their locations at the top (x4) and bottom (x4) faces of the Liquid Oxygen Tank – use the pictures below to ensure correct positions of the magnets
  3. STEP 7c: Install the Top Dome to the Liquid Oxygen Tank
  4. STEP 7d: Glue 2x magnets (3mm dia x 2mm thick) into their locations on the Bottom Dome
  5. STEP 7e: Install the Bottom Dome to the Liquid Oxygen Tank – use the alignment feature on the Bottom Dome to ensure correct orientation
  6. STEP 7f: Insert 2x Locating Pins into the holes on the top face of the Liquid Oxygen Tank

STEP 8: Assemble the Intertank

Parts required (refer to the photos below)

  • 1x Intertank (a)
  • 2x Access Panels (b)
  • 2x LOX Downcomer Aero Covers (c)
  • 1x Intertank Cross Beam (d)
  • 2x LOX Downcomer (Short) Pipes (e)
  • 2x Locating Pins (f)
  • 6x Magnets (3mm dia x 2mm thick) (highlighted in RED)
  • 14x Magnets (5mm dia x 3mm thick) (highlighted in RED)

Assembly process

  1. STEP 8a: Glue 2x Access Panels to the side of the Intertank
  2. STEP 8b: Glue 2x magnets (3mm dia x 2mm thick) into their locations on the side of the Intertank.

    IMPORTANT: Ensure that the magnets sit flush with the bottom face of the recess that they are glued to. Otherwise, the LOX Downcomer Aero Covers won’t sit properly in those recesses. STEP 8c can also be done prior to this if it helps – however, you’ll need to glue the magnets in from inside of the Intertank

  3. STEP 8c: Glue 2x LOX Downcomer Aero Covers to the side of the Intertank
  4. STEP 8d: Glue the Intertank Cross Beam into the Intertank
  5. STEP 8e: Glue 8x magnets (5mm dia x 3mm thick) into their locations at the top (x4) and bottom (x4) faces of the Intertank – use the pictures below to ensure correct positions of the magnets. Then, glue 6x magnets (5mm dia x 3mm thick) into their locations on each side  (3x per side) of the Intertank
  6. STEP 8f: Glue 2x magnets (3mm dia x 2mm thick) into the holes at each end of each LOX Downcomer (Short) Pipe
  7. STEP 8g: Install 2x LOX Downcomer (Short) Pipes to the Intertank
  8. STEP 8h: Insert 2x Locating Pins into the holes on the top face of the Intertank

STEP 9: Assemble the Liquid Hydrogen Tank

Parts required (refer to the photos below)

  • 1x Liquid Hydrogen Tank (Top) (a)
  • 1x Liquid Hydrogen Tank (Bottom) (b)
  • 2x Matrix markings (c)
  • 1x Liquid Hydrogen Tank Top Dome (d)
  • 1x Liquid Hydrogen Tank Bottom Dome (e)
  • 4x Locating Pins (f)
  • 5x Magnets (3mm dia x 2mm thick) (highlighted in RED)
  • 16x Magnet (5mm dia x 3mm thick) (highlighted in RED)

Assembly process

  1. STEP 9a: Glue 8x magnets (5mm dia x 3mm thick) into their locations at the top (x4) and bottom (x4) faces of the Liquid Hydrogen Tank (Top) – use the pictures below to ensure correct positions of the magnets
  2. STEP 9b: Install the Top Dome to the Liquid Hydrogen Tank (Top)
  3. STEP 9c: Insert 2x Locating Pins into the holes on the top face of the Liquid Hydrogen Tank (Top)
  4. STEP 9d: Glue 8x magnets (5mm dia x 3mm thick) into their locations at the top (x4) and bottom (x4) faces of the Liquid Hydrogen Tank (Bottom) – use the pictures below to ensure correct positions of the magnets
  5. STEP 9e: Glue 2x Matrix markings to the side of the Liquid Hydrogen Tank (Bottom)
  6. STEP 9f: Glue 5x magnets (3mm dia x 2mm thick) into their locations on the Liquid Hydrogen Tank Bottom Dome
  7. STEP 9g: Install the Bottom Dome to the Liquid Hydrogen Tank (Bottom) – use the alignment feature on the Bottom Dome to ensure correct orientation
  8. STEP 9h: Insert 2x Locating Pins into the holes on the top face of the Liquid Hydrogen Tank (Bottom)
  9. STEP 9i: Install the Liquid Hydrogen Tank (Top) and (Bottom) together

STEP 10: Assemble the Engine Section

Parts required (refer to the photos below)

  • 1x Engine Section (a)
  • 1x Engine Section Bracing (b)
  • 4x RS-25 Engines (Top) (c)
  • 4x RS-25 Engines (Bottom) (d)
  • 4x LH2 Downcomers (e)
  • 2x LOX Downcomer Manifolds (f)
  • 1x LH2 Feed Pipe (g)
  • 2x Locating Pins (h)
  • 21x Magnets (3mm dia x 2mm thick) (highlighted in RED)
  • 10x Magnet (5mm dia x 3mm thick) (highlighted in RED)

Assembly process

  1. STEP 10a: Glue 4x magnets (5mm dia x 3mm thick) into their locations at the top (x4) face of the Engine Section – use the pictures below to ensure correct positions of the magnets. Then, glue 6x magnets (5mm dia x 3mm thick) into their locations on each side (3x per side) of the Engine Section
  2. STEP 10b: Install the Engine Section Bracing into the Engine Section (you may need to slightly flex the Engine Section Bracing to get it in). Please note that the Engine Section Bracing has alignment features which allow you to position it correctly inside the Engine Section.

    IMPORTANT: DO NOT glue the Engine Section Bracing to the Engine Section at this STEP just yet. Doing so will prevent you from installing the RS-25 engines at the next STEP.

  3. STEP 10c: Glue 2x magnets (3mm dia x 2mm thick) into their locations at the top of each RS-25 Engines (Top)
  4. STEP 10d: Maneuver 4x RS-25 Engines (Top) through the Engine Section Bracing and glue them to the Engine Section – please note there are alignment recesses in the Engine Section for positioning the engines correctly. Then glue the Engine Section Bracing to the Engine Section.
  5. STEP 10e: Glue 4x RS-25 Engine (Bottom) to the Engine Section
  6. STEP 10f: Glue 2x magnets (3mm dia x 2mm thick) into both ends of each LH2 Downcomer pipe
  7. STEP 10g: Glue 2x magnets (3mm dia x 2mm thick) into the bottom holes of each LOX Downcomer Manifolds
  8. STEP 10h: Glue 1x magnet (3mm dia x 2mm thick) into the hole at one end of the LH2 Feed Pipe
  9. STEP 10i: Glue the LH2 Feed Pipe to one of the LOX Downcomer Manifolds – see pictures below
  10. STEP 10j: Install all the plumbing into the Engine Section
  11. STEP 10k: Insert 2x Locating Pins into the holes on the top face of the Engine Section

STEP 11: Assemble the complete Core Stage

Parts required (refer to the photos below)

  • 1x Raceway_01 (a1)
  • 1x Raceway_02 (a2)
  • 1x Raceway_03 (a3)
  • 1x Raceway_04(a4)
  • 1x Raceway Aero Cover (a5)
  • 1x Raceway Matrix marking (a6)
  • 2x LOX Downcomer_01 (b1)
  • 2x LOX Downcomer_02 (b2)
  • 2x LOX Downcomer_03 (b3)
  • 2x External Pipes_01 (c1)
  • 1x External Pipes_02 (c2)
  • 1x External Pipes_03 (c3)
  • 1x External Pipes_04 (c4)
  • 1x External Pipes_05 (c5)
  • 1x External Pipes_06 (c6)
  • 1x External Pipes_07 (c7)
  • All Sections from STEP 5 to STEP 10 above

Assembly process

  1. STEP 11a: Assemble all Sections from STEP 5 to STEP 10 together
  2. STEP 11b: Carefully glue all segments of the Raceway to the Core Stage. Hint: Start from the bottom and work toward the top of the Core Stage

    IMPORTANT: The Raceway was split into 5 segments so that each segment can be glued to the relevant Section of the Core Stage respectively – this allows the Core Stage to be split/assembled in the end. Therefore, DO NOT over glue the Raceway segments

  3. STEP 11c: Carefully glue all segments of the LOX Downcomer to the Core Stage. Hint: Start from the bottom and work toward the top of the Core Stage

    IMPORTANT: The LOX Downcomer was split into 3 segments so that each segment can be glued to the relevant Section of the Core Stage respectively – this allows the Core Stage to be split/assembled in the end. Therefore, DO NOT over glue the LOX Downcomer segments

  4. STEP 11d: Carefully glue all segments of the External Pipes to the Core Stage. Hint: Start from the bottom and work toward the top of the Core Stage

    IMPORTANT: The Raceway was split into 7 segments so that each segment can be glued to the relevant Section of the Core Stage respectively – this allows the Core Stage to be split/assembled in the end. Therefore, DO NOT over glue the External Pipes segments

STEP 12: Assemble the Solid Rocket Boosters

Parts required (refer to the photos below)

  • 1x Solid Rocket Booster_1 (LH) (a1)
  • 1x Solid Rocket Booster_2 (LH) (a2)
  • 1x Solid Rocket Booster_3 (LH) (a3)
  • 1x Solid Rocket Booster_4 (LH) (a4)
  • 1x Solid Rocket Booster_5 (LH) (a5)
  • 1x Solid Rocket Booster_6 (LH) (a6)
  • 1x Solid Rocket Booster_7 (LH) (a7)
  • 1x Solid Rocket Booster Matrix marking (LH) (a8)
  • 1x Solid Rocket Booster_1 (RH) (b1)
  • 1x Solid Rocket Booster_2 (RH) (b2)
  • 1x Solid Rocket Booster_3 (RH) (b3)
  • 1x Solid Rocket Booster_4 (RH) (b4)
  • 1x Solid Rocket Booster_5 (RH) (b5)
  • 1x Solid Rocket Booster_6 (RH) (b6)
  • 1x Solid Rocket Booster_7 (RH) (b7)
  • 1x Solid Rocket Booster Matrix marking (RH) (b8)
  • 2x Solid Propellant_2 (c2)
  • 2x Solid Propellant_3 (c3)
  • 2x Solid Propellant_4 (c4)
  • 2x Solid Propellant_5 (c5)
  • 2x Solid Propellant_6 (c6)
  • 16x Solid Rocket Booster Black Square marking (d)
  • 20x Solid Rocket Booster Black Stripe marking (e)
  • 4x Locating Pins (f)
  • 4x 3mm dia x 20mm L Dowel Pin (g)
  • 4x Magnet (3mm dia x 2mm thick) (highlighted in RED)
  • 12x Magnet (5mm dia x 3mm thick) (highlighted in RED)

Assembly process

  1. STEP 12a: Insert 2x Locating Pins into the holes on the top face of the Solid Rocket Booster_1 (LH)
  2. STEP 12b: Glue 3x magnets (5mm dia x 3mm thick) into their locations on the side of the Solid Rocket Booster_2 (LH). Glue 2x magnets (3mm dia x 2mm thick) into the holes just below the 5x3mm magnets (ensure that the magnets are pushed all the way into the holes), then insert one Dowel Pin (3mm dia x 20mm L) into each hole. Finally, insert a Solid Propellant_2 into the Solid Rocket Booster_2 (LH)
  3. STEP 12c: Insert the correct markings (Black Square & Black Stripe) onto the outer of the Solid Rocket Booster_3 (LH). Then, insert a Solid Propellant_3 into the Solid Rocket Booster_3 (LH)
  4. STEP 12d: Insert the correct markings (Black Stripe) onto the outer of the Solid Rocket Booster_4 (LH). Then, insert a Solid Propellant_4 into the Solid Rocket Booster_4 (LH)
  5. STEP 12e: Insert the correct markings (Black Stripe) onto the outer of the Solid Rocket Booster_5 (LH). Then, insert a Solid Propellant_5 into the Solid Rocket Booster_5 (LH)
  6. STEP 12f: Insert the correct markings (Black Square & Black Stripe) onto the outer of the Solid Rocket Booster_6 (LH). Then, insert a Solid Propellant_6 into the Solid Rocket Booster_6 (LH)
  7. STEP 12g: Glue 3x magnets (5mm dia x 3mm thick) into their locations on the side of the Solid Rocket Booster_7 (LH). Then, insert the Matrix marking (LH) to the outer of the Solid Rocket Booster_7 (LH)
  8. STEP 12h: Install all segments of the Solid Rocket Booster (LH) together
  9. STEP 12i: Repeat the same STEPs above to build the Solid Rocket Booster (RH)

STEP 13: Assemble the Artemis II Rocket

Parts required (refer to the photos below)

  • 1x Second Stage from STEP 4 (a)
  • 1x Core Stage from STEP 11 (b)
  • 1x Solid Rocket Booster (LH) from STEP 12 (c)
  • 1x Solid Rocket Booster (RH) from STEP 12 (d)
  • 1x Basic Stand (e)

Assembly process

  1. STEP 13a: Install the Second Stage to the Core Stage.
  2. STEP 13b: Install the Solid Rocket Boosters to the Core Stage
  3. STEP 13c: Place the Artemis II onto its Stand

And that’s it! Congratulations, you have completed your 1:96 ARTEMIS-II model!